Shop work, Feb 19, 2018

Mapped out the fuel line routing, and got it plumbed as far as first filter. At lot of cutting and grinding to make sure lines have a straight shot and are away from sharp edges.

Then took it back off so all of paint can be touched up on Monday. I’m still waiting for the fuel pump so I can finish. I expect to be finished Monday.

Want to see if I can flip Vacuum Pump around, so that regulator is on top and puke tank line on bottom.

New red and black 10 gauge, along with a red and green 12 gauge wires were wrapped in convoluted tubing and strung front to back for tail lights and fuel pump relay. I’ll secure to frame Monday.

The cutting, grinding  and mocking up took a lot than expected, so it was late before I could cover the car and head home.

 

Spread the love